Mace Construct and Mace Consult operate as two independent businesses. Mace Consult launched as a new and independent business on 5 March 2026, through a carve-out from Mace Group. Information, references and materials on this website may represent operations prior to the demerger. Go to Mace Consult here.

N06 East Village

The next gen of homes

Off-site assembled. On-site delivered. Safer living.

View of two mixed-use development towers

Key takeaways

524

homes created

4

residential tower blocks

50

hours to build one floor

Skybridge installation at East Village N06

  • The development comprises two residential towers, at 26 and 31 storeys high and two ten-storey pavilions connected by a high-level inhabited bridge.  
  • Mirrored off-site manufacturing utilised at our award-winning Jump Factory for N08 (Victoria Plaza), resulting in 40% vehicle reduction and 60% fewer people on site.  
  • With one floor taking just 50 hours to complete and consisting of 96 factory made parts, programme time significantly reduced allowed a for a faster delivery.

Innovation has been central to the N06 East Village project, driven by a forward-thinking client and subcontractor team. Mace was appointed to construct N06 in East London’s East Village, featuring two residential towers (26 and 31 storeys) and two ten-storey pavilions connected by a high-level inhabited skybridge. This project follows the success of N08 (Victory Plaza), where the team pioneered the award-winning jump factory, reducing safety risks and improving delivery speed. 

For N06, the team developed a digitally driven offsite manufacture and assembly approach called High Rise Solutions. In a UK first, both façade and structural components were delivered as sub-assemblies, adopting a unique approach pioneered with Hickory in Australia. This method ensured each floor was installed fully enclosed, significantly reducing project time and height-related risks. 

By converting site activities to an offsite assembly process, the team drastically reduced programme times, improved safety, and minimized local disruption. Each floor consists of 96 factory-made components, pre-assembled in a controlled environment before onsite installation. This production line approach allowed for 95% of components to be pre-assembled. 

The team used digital engineering solutions to track components, enabling ‘just-in-time’ delivery with consistent quality. Using parametric modelling tools and AI, High Rise Solutions designed and manufactured the structure and façade offsite, ensuring a faster and guaranteed programme. 

The project also brought benefits like reduced waste and less transport. Local workers were trained in multi-skills, opening new career opportunities and enhancing their skillsets. 

N06 East Village showcases how innovation, digital engineering, and offsite manufacturing can revolutionise home construction – better, faster, and safer.

Mace Logo

Mace Consult and Mace Group are now two independent businesses.

In 2025, a majority investment in Mace Consult by Private Equity at Goldman Sachs Alternatives was announced through a demerger from Mace Group.

This completed on 5 March 2026, with Mace Consult and Mace Group (which includes Mace Construct) now independent businesses. To continue, please choose whether you want to explore Mace Consult or Mace Construct.